Protocols, requirements and official system documents

PROCEED. REBUILD. STOP.
Three paths. One protocol. Access knows no exceptions.

Entry Statement

Submission of a project does not guarantee access. Every product is evaluated according to system protocols.

PROCEED

Project admitted to market validation

REBUILD

Project requires structural adjustment

STOP

Project does not meet market validation criteria

STOP is not a rejection. It is the formal determination that the market hypothesis is not confirmed at this time.

Basic Requirements

A project can be submitted to the system if it meets the following basic requirements:

Physically existing product or prototype

Clearly formulated market hypothesis

Ability to conduct a pilot test

Operational readiness for market validation

Concepts without a real product are not considered.

System Documents

Download official CINTREXO system documents, protocols and submission materials required for project evaluation and entry into the system.

Entry Questionnaire

Structured questionnaire for project submission

Download PDF ↓

Project Architecture Template

Template for product description and economic model

Download PDF ↓

STOP Criteria

Non-negotiable criteria that automatically stop a project

Download PDF ↓

System Principles

Core principles of the CINTREXO system

Download PDF ↓

Status Protocol

Description of project movement through the system

Download PDF ↓

Important Notice

CINTREXO is not a consulting service and does not provide support in preparing applications.

Projects are evaluated exclusively according to system protocols.

System decisions are not subject to appeal.

Submission

All documents must be submitted in PDF format  by email.